Long-distance channel and dispersed site inspection plan
Inspection of roads, pipelines and dispersed sites often faces problems such as long lines, large differences in sections, and difficulty in handover at abnormal locations.
Inspection of roads, pipelines and dispersed sites often faces problems such as long lines, large differences in sections, and difficulty in handover at abnormal locations. The plan does not simply draw the entire route as a flight mission, but first marks the required sections, available take-off and landing points, terrain obstruction and ground arrival time, and then splits the flight sections according to risk and workload.
The YH-2000 has a maximum load of 15 kg and a maximum endurance of 600 minutes, making it suitable for comparison into long-distance inspection plans. The load determines the weight boundary of optional observation equipment, and the endurance is used to estimate the possibility of continuous coverage; the control radius can be customized from 50 to 100 km, but the control range cannot be directly equated to the actual patrolable length. The final flight segment still needs to be determined based on the target equipment, communication conditions and return margin.

Regular sections use unified shooting directions and file naming, while key sections retain both panoramic and partial images. When suspected damage, blockage or appearance changes are found, the operator marks the section, coordinates, time and image number, and professionals then determine whether on-site processing is required. This can shorten retrieval time and avoid mistaking lighting, viewing angle, or seasonal changes for facility anomalies.
When handing over between teams, the problem status can be divided into pending review, processing and closed, and updated after each repeat flight. If temporary construction, weather or control changes the flyable sections, the mission map must also be adjusted simultaneously. The maximum parameters of the platform cannot replace the actual test flight; the picture clarity, data return and onboard flight time should be checked under the target configuration before deciding whether to expand the coverage.
The deliverables mainly include section coverage tables, problem point maps, original image links and disposal records. The inspection team can continuously accumulate data according to the same rules and compare the status of the same facility on different dates. YH-2000 provides platform options required for wide-area inspection. Whether the solution is effective depends on the implementation of flight segment planning, equipment adaptation and abnormal closed loop.